HHP Summit 2017

Telefonix PowerPost EVSE

PowerPost Chargers for EWU Campus

April 26, 2016 in EVs, EVSE, Infrastructure by Patrick Couch  |  No Comments

Four Level 2 Units for Cheney, Washington Campus

Eastern Washington University has installed four new PowerPost electric vehicle charging units from Telefonix at its campus in Cheney, outside Spokane.

‘We are serious about our commitment to sustainability,’ said EWU president Mary Cullinan.

‘We are serious about our commitment to sustainability,’ said EWU president Mary Cullinan.

Two of the Level 2 chargers are located in front of EWU’s Computing and Engineering Building and another two are located outside the campus Visitor Center.

“The installation of these charging stations is part of Eastern’s long-term plan to cut greenhouse gas emissions,” university president Mary Cullinan said in a release.

PowerPost’s new eGauge

“We are serious about our commitment to sustainability and believe PowerPost EVSE furthers our commitment to preserving the earth,” she said.

The chargers for EWU are the first PowerPost EV units installed with an eGauge system, an electrical power meter that will solely monitor EV Charger usage. “The eGauge system is installed directly to the circuit to track total energy consumption, allowing EWU to research the energy efficiency of PowerPost EVSE, without monthly networking fees or maintenance contracts,” the company says.

‘Energy Efficiency and Low Cost Per Use’

“PowerPost EVSE is the perfect charger for installations where cars are parked for two hours or more, like a university,” Telefonix business development manager Bill Williams, says in the EWU announcement.


“The energy efficiency and low cost per use keeps money in the university’s pocket so they can spend it on what truly matters- providing quality education,” he said.

In other recent news, the first PowerPost charger, an L2 Level 2 unit, at a nature preserve was installed at the Wildlands Conservancy's Oak Glen Preserve in Oak Glen, Calif.

In other recent news, the first PowerPost charger, at a nature preserve, an L2 Level 2 unit, was installed at the Wildlands Conservancy’s Oak Glen Preserve in Oak Glen, Calif.

 


-------------------------------
Contact information is only available to premium subscribers. Click here to purchase a subscription.

Source: Telefonix/PowerPost with Fleets & Fuels follow-up

Telefonix On-Wall PowerPost EVSE

January 29, 2016 in EVs, EVSE by Rich Piellisch  |  No Comments

Aimed at Parking Facilities with Limited Space, Indoor or Out

Telefonix has introduced wall-mounted versions of its L1 PowerPost and L2 PowerPost units. “Designed for inside or outside parking situations, this new product variation offers parking facilities with limited space another option for becoming equipped for the electric vehicle revolution,” the company says.
Read More >>

Telefonix PowerPosts for Portland PDX: 42

August 17, 2015 in Electric Drive, EVs, EVSE by Rich Piellisch  |  No Comments

‘Largest Installation of EV Charging Stations at an Airport in the U.S.’

Telefonix is talking up “the largest installation of commercial electric vehicle chargers at an airport in the United States,” as Portland International in Oregon has installed 42 of the manufacturer’s L1 PowerPost units.
Read More >>

PowerPost Prospers in Workplace EVSE

June 5, 2015 in EVs, EVSE, Infrastructure by Rich Piellisch  |  No Comments

Telefonix Says Its EV Chargers Are Multiplying Across the U.S.

Telefonix reports that its PowerPost brand commercial electric vehicle charging units are finding a strong market with companies looking to provide charging for their employees, and that “a number of their customers’ facilities with existing installations are ordering more units to meet the demand of their EV driving patrons.”
Read More >>



  • Archives